<!-- Source: https://www.nitronedge.com/services/accelerators/cfo-office/ -->
# Agentic CFO Office

A set of finance agents that work with your CPM and data platforms to accelerate the close, reconcile accounts, update forecasts and draft management commentary, with controllers approving every material step.

## Included
- Close-task and reconciliation agents
- Variance-analysis and commentary agent
- Rolling-forecast assistant
- Integration with CCH Tagetik, IBM Planning Analytics, Snowflake or Power BI
- Approval workflow and audit trail

## Partners
- CCH Tagetik
- IBM
- Snowflake
- Power BI

## Industries
- Banking & Financial Services
- Oil & Gas
- Retail & Consumer
- Telecommunications
- Public Sector & Government

<!-- ne:acc -->

## The problem
Every month-end, finance teams chase late tasks, reconcile intercompany balances and write variance commentary for each business unit, often against a tight board deadline. Much of the work repeats month after month, but it still needs care and judgement.

The Agentic CFO Office accelerator adds agents that track the close, run agreed checks, explain variances from your planning model and draft commentary in your house style. Controllers review and approve everything before it reaches management.

Finance is often where trust in AI agents is won or lost inside a company. Because every number can be traced back to the ledger, controllers can check the agents' work line by line, and auditors can follow the same trail. Teams that start with the close usually extend the agents to rolling forecasts, board pack preparation and cash flow commentary next, reusing the same connections to the ledger and planning model and the same review process.

## What you get
- **Close tracking agent:** Watches the close calendar, reminds task owners and reports blockers to the controller.
- **Checks agent:** Runs agreed checks such as intercompany differences, unusual journals and unreversed accruals.
- **Variance agent:** Finds the drivers of material variances using the ledger and your CPM or planning model.
- **Commentary drafts:** Management commentary in your style, with every figure linked to its source query.
- **Integration:** Connections to CCH Tagetik, IBM Planning Analytics, Snowflake or Power BI, depending on your stack.

## Time it takes
- Discovery: calendar, checks and style: Weeks 1 to 2
- Build and connect: Weeks 3 to 5
- First supervised close: Weeks 6 to 8

What your team puts in: A financial controller for a weekly review, one FP&A analyst to agree materiality and commentary style, and access to the ledger and planning model through your IT team.

## Sample output: Example variance commentary draft (illustrative)
- **Business unit:** Downstream marketing, May
- **Variance:** Operating costs 6.2% above budget (made-up figure)
- **Main drivers:** Higher freight rates on two routes (about two-thirds of the variance); a one-off maintenance shutdown brought forward from June (about one-third)
- **Draft commentary:** Operating costs were above budget, mainly because of higher freight rates on two export routes and a maintenance shutdown that moved from June into May. The shutdown is a timing difference and should reverse next month.
- **Sources:** Ledger cost centres 4100 to 4180; planning model freight driver; maintenance schedule
- **Status:** Waiting for controller review

## Is it right for you?
A good fit if you are:
- Groups with many entities and repeated monthly analysis
- Finance teams using a CPM tool such as CCH Tagetik or IBM Planning Analytics
- Organisations that want faster closes without changing their ERP

Probably not the right start if you are:
- Businesses without a stable chart of accounts or budget model
- Teams looking for agents to post journals automatically

## FAQ

### Do we need to change our ERP or CPM tool?
No. The agents read from your existing ledger and planning model, such as CCH Tagetik, IBM Planning Analytics, Snowflake or Power BI.

### Will the commentary sound like us?
Drafts follow a style guide agreed in discovery, and the agent learns from the edits controllers make each month.

<!-- /ne:acc -->
